Photos Required for ALL Projects

Lease and Loan installations require photos to be uploaded to their respective Account in the Dealer Portal. Below is a list of the photos required in order to closed out an installation. To upload photos to the Dealer Portal, refer to Uploading Invoice Compliance Documents and the Job Close-Out Template in SunPower University.

  • Survey Photo Process

Site Documentation Photo #1

Every photo listed is required. If a photo cannot be provided, including a detailed explanation; forgetting to take a particular photo is not a sufficient reason. For example, a valid reason photo #5 might not be provided could be because there was no conduit penetration because the conduit wraps around the gable end. (State that, if so.)

• To expedite the review, please upload the photos in the order listed below.
• Save the document as a PDF, using the following convention:
*Client LAST NAME* - *DATE OF INSTALLATION* - SunPower JCO

Example: O’LEARY – 04072019 – SunPower JCO
• Verify the file size (all photos combined) is 10MB or less

Plan set showing Homeowner FIRST and LAST NAME and FULL address

Photo 1

Max. size: 64.0 MB

Site Documentation Photo #2

Module type, total quantity, and layout

Photo 2

Max. size: 64.0 MB

Site Documentation Photo #3

Installing Dealer (business) name and Crew Lead name

Photo 3

Max. size: 64.0 MB

Site Documentation Photo #4

Physical address (number) with the home in the background

Photo 4

Max. size: 64.0 MB

Site Documentation Photo #5

All conduit penetrations showing flashing (includes eave penetration)

Photo 5

Max. size: 64.0 MB

Site Documentation Photo #6

All installed rails, mounts, and J-box with penetration flashing showing ground lug and copper attached (For ground-mounted systems, show array structure without modules installed. No need to show junction box exterior)

Photo 6

Max. size: 64.0 MB

Site Documentation Photo #7

Bonding of all rows of modules (bare copper or row-to-row ground clips)

Photo 7

Max. size: 64.0 MB

Site Documentation Photo #8

All installed modules in the entire system (multiple photos may be required)

Photo 8

Max. size: 64.0 MB

Site Documentation Photo #9

Wires managed under the array, and no wires between roof and rail

Photo 9

Max. size: 64.0 MB

Site Documentation Photo #10

String labeling inside each junction box (for roof and ground-mounted systems)

Photo 10

Max. size: 64.0 MB

Site Documentation Photo #11

Wide shot of all electrical equipment

Photo 11

Max. size: 64.0 MB

Site Documentation Photo #12

Solar subpanel wiring, breakers (including PVS breaker), and production CT

Photo 12

Max. size: 64.0 MB

Site Documentation Photo #13

Wiring of the AC disconnect (if installed)

Photo 13

Max. size: 64.0 MB

Site Documentation Photo #14

Consumption CTs (if installed) with the orientation of CTs visible

Photo 14

Max. size: 64.0 MB

Site Documentation Photo #15

Wiring at the point of interconnection (e.g.in main panel) with dead front removed

Photo 15

Max. size: 64.0 MB

Site Documentation Photo #16

Array layout diagram with microinverter serial numbers (stickers)

Photo 16

Max. size: 64.0 MB

Site Documentation Photo #17

Array layout diagram indicating circuit layout

Photo 17

Max. size: 64.0 MB

Site Documentation Photo #18

PVS serial number

Photo 18

Max. size: 64.0 MB

Site Documentation Photo #19

PVS wiring terminations (AC power and CT wires)

Photo 19

Max. size: 64.0 MB

Site Documentation Photo #20

Extra meters if required by AHJ/utility

Photo 20

Max. size: 64.0 MB

Site Documentation Photo #21

Document pre-existing conditions (e.g., roof issues or broken tiles)

Photo 21

Max. size: 64.0 MB

Site Documentation - Final Notes

Additional for Projects Featuring Storage

Lot name and community name

Storage Unit Serial Number

Wide angle of unit(s) mounted

Wiring into critical load center, dead front off (if applicable)

Wiring into critical load center clearly showing labeling of circuits

Storage commissioning complete

Go Solar Now